MWPowerPlantFacts

Data last collected:

EIA plant 6155

Festus · Jefferson · MO

Rush Island

Operated by Union Electric Co - (MO)

Annual generation510,189 MWhSum of represented EIA-923 rows
Fuel codesUnavailableCodes retained from EIA records
Grid contextMidcontinent Independent Transmission System Operator, Inc..Balancing authority or NERC region

Published location

Where is Rush Island?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

38.131248, -90.263157

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1218,655.01
250,510
36,131
43,391
5-6,138
6100,522
718,596
872,648
945,874
100
110
120

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1218,655.01
250,510
36,131
43,391
5-6,138
6100,522
718,596
872,648
945,874
100
110
120

2024 monthly net generation

MonthNet generation
1218,655 MWh
250,510 MWh
36,131 MWh
43,391 MWh
5-6,138 MWh
6100,522 MWh
718,596 MWh
872,648 MWh
945,874 MWh
100 MWh
110 MWh
120 MWh

Operating generators

IDTechnologyFuelMWStatus

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
6155
Sector
Electric Utility
Water source
Mississippi River
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Rush Island power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Rush Island

Variation in the published months

Across 11 numeric monthly generation entries, 1 has the highest recorded value (218,655 MWh) and 10, 11, 12 the lowest (0 MWh). Their difference is 218,655 MWh. Missing months have not been treated as zero.

Power plant research

Before you decide, check these points against the current source.

Things to check