PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/61871
EIA plant 61871
Greenville · Hunt · TX
Sterling Solar (TX)
Operated by Cypress Creek Renewables
Published location
Where is Sterling Solar (TX)?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
33.166173, -96.172617
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 787 MWh |
| 2 | 968 MWh |
| 3 | 1,397 MWh |
| 4 | 1,421 MWh |
| 5 | 1,036 MWh |
| 6 | 0 MWh |
| 7 | 321 MWh |
| 8 | 1,394 MWh |
| 9 | 1,118 MWh |
| 10 | 980 MWh |
| 11 | 638 MWh |
| 12 | 473 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| GEN1 | Solar Photovoltaic | SUN | 10 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
61871
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final