MWPowerPlantFacts
EIA plant 61887

El Paso · El Paso · TX

Fort Bliss (DEA EPIC)

Operated by Ameresco Federal Solutions

Annual generation4,493 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextEl Paso Electric CompanyBalancing authority or NERC region

Published location

Where is Fort Bliss (DEA EPIC)?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

31.829986, -106.372861

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
1306 MWh
2304 MWh
3367 MWh
4428 MWh
5480 MWh
6413 MWh
7423 MWh
8404 MWh
9395 MWh
10391 MWh
11313 MWh
12269 MWh

Operating generators

IDTechnologyFuelMWStatus
DEPICSolar PhotovoltaicSUN2OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
61887
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final