MWPowerPlantFacts
EIA plant 61920

Paint Rock · Concho · TX

Galloway 1 Solar Farm

Operated by 225DD 8me LLC

Annual generation504,009 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextElectric Reliability Council of Texas, Inc.Balancing authority or NERC region

Published location

Where is Galloway 1 Solar Farm?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

31.435932, -99.796613

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
124,570 MWh
231,545 MWh
341,133 MWh
433,285 MWh
535,064 MWh
650,725 MWh
759,526 MWh
864,693 MWh
952,906 MWh
1046,082 MWh
1135,717 MWh
1228,763 MWh

Operating generators

IDTechnologyFuelMWStatus
GSM01Solar PhotovoltaicSUN250OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
61920
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final