EIA plant 61955

Grand Ledge · Eaton · MI

Delta Solar Power II

Operated by Delta Solar Power II, LLC

Annual generation26,323 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextMidcontinent Independent Transmission System Operator, Inc..Balancing authority or NERC region

Published location

Where is Delta Solar Power II?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

42.707000, -84.700000

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic15.9 MW represented

Grouped from this plant’s represented generator records. Use the MI plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1238
21,620
32,015
43,042
53,577
63,315
73,564
83,150
92,637
102,058
11725
12382

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1238
21,620
32,015
43,042
53,577
63,315
73,564
83,150
92,637
102,058
11725
12382

2024 monthly net generation

MonthNet generation
1238 MWh
21,620 MWh
32,015 MWh
43,042 MWh
53,577 MWh
63,315 MWh
73,564 MWh
83,150 MWh
92,637 MWh
102,058 MWh
11725 MWh
12382 MWh

Operating generators

IDTechnologyFuelMWStatus
DSPIISolar PhotovoltaicSUN15.9OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
61955
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Delta Solar Power II power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Delta Solar Power II

Variation in the published months

Across 12 numeric monthly generation entries, 5 has the highest recorded value (3,577 MWh) and 1 the lowest (238 MWh). Their difference is 3,339 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
DSPIISolar Photovoltaic15.915.214.4Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check