MWPowerPlantFacts
EIA plant 62086

St. Michael · Wright · MN

Becker Solar 4 CSG

Operated by SunShare Management

Annual generation1,603 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextMidcontinent Independent Transmission System Operator, Inc..Balancing authority or NERC region

Published location

Where is Becker Solar 4 CSG?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

45.175662, -93.679726

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
152 MWh
2114 MWh
3171 MWh
4152 MWh
5188 MWh
6131 MWh
7186 MWh
8172 MWh
9185 MWh
10142 MWh
1169 MWh
1241 MWh

Operating generators

IDTechnologyFuelMWStatus
BCKR4Solar PhotovoltaicSUN1OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
62086
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final