PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/62131
EIA plant 62131
Selma · Johnston · NC
Red Toad 4451 Buffalo Road, LLC
Operated by Sol Systems
Published location
Where is Red Toad 4451 Buffalo Road, LLC?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
35.557397, -78.297336
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 251 MWh |
| 2 | 311 MWh |
| 3 | 348 MWh |
| 4 | 381 MWh |
| 5 | 395 MWh |
| 6 | 431 MWh |
| 7 | 376 MWh |
| 8 | 397 MWh |
| 9 | 314 MWh |
| 10 | 391 MWh |
| 11 | 261 MWh |
| 12 | 237 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| G4451 | Solar Photovoltaic | SUN | 2 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
62131
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final