MWPowerPlantFacts
EIA plant 62178

Desert Center · Riverside · CA

Maverick Solar, LLC

Operated by Maverick Solar, LLC

Annual generation375,417 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Maverick Solar, LLC?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

33.700000, -115.380000

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
118,437 MWh
223,162 MWh
331,854 MWh
437,576 MWh
542,651 MWh
641,726 MWh
739,895 MWh
837,612 MWh
933,409 MWh
1027,451 MWh
1122,547 MWh
1219,097 MWh

Operating generators

IDTechnologyFuelMWStatus
MAV01Solar PhotovoltaicSUN125OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
62178
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final