MWPowerPlantFacts
EIA plant 62427

Harrison · Muskingum · OH

Philo L&D Hydroelectric Project

Operated by Rye Development

Annual generation0 MWhSum of represented EIA-923 rows
Fuel codesUnavailableCodes retained from EIA records
Grid contextPJM Interconnection, LLCBalancing authority or NERC region

Published location

Where is Philo L&D Hydroelectric Project?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

39.870343, -81.909770

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Operating generators

IDTechnologyFuelMWStatus

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
62427
Sector
IPP Non-CHP
Water source
Muskingum River
Data edition
2024-final