MWPowerPlantFacts

Data last collected:

EIA plant 62705

El Segundo · Los Angeles · CA

Equinix Maple Ave. Fuel Cell

Operated by 2016 ESA Project Company, LLC

Annual generation7,728 MWhSum of represented EIA-923 rows
Fuel codesNGCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Equinix Maple Ave. Fuel Cell?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

33.925420, -118.394630

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyOther Natural Gas2 MW represented

Grouped from this plant’s represented generator records. Use the CA plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1627
2571
3648
4630
5648
6648
7693
8661
9634
10654
11649
12665

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1627
2571
3648
4630
5648
6648
7693
8661
9634
10654
11649
12665

2024 monthly net generation

MonthNet generation
1627 MWh
2571 MWh
3648 MWh
4630 MWh
5648 MWh
6648 MWh
7693 MWh
8661 MWh
9634 MWh
10654 MWh
11649 MWh
12665 MWh

Operating generators

IDTechnologyFuelMWStatus
EQX08Other Natural GasNG2OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
62705
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Equinix Maple Ave. Fuel Cell power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Equinix Maple Ave. Fuel Cell

Variation in the published months

Across 12 numeric monthly generation entries, 7 has the highest recorded value (693 MWh) and 2 the lowest (571 MWh). Their difference is 122 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
EQX08Other Natural Gas2.02.02.02.0

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check