PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/62747
EIA plant 62747
Ravenna · Estill · KY
Matilda Hamilton Fee Hydroelectric Stati
Operated by Lock 12 Hydro Partners, LLC
Published location
Where is Matilda Hamilton Fee Hydroelectric Stati?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
37.677484, -83.948553
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 744 MWh |
| 2 | 850 MWh |
| 3 | 962 MWh |
| 4 | 909 MWh |
| 5 | 928 MWh |
| 6 | 567 MWh |
| 7 | 442 MWh |
| 8 | 515 MWh |
| 9 | 287 MWh |
| 10 | 404 MWh |
| 11 | 524 MWh |
| 12 | 849 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | WAT | 0.5 | OP |
| 2 | Conventional Hydroelectric | WAT | 0.5 | OP |
| 3 | Conventional Hydroelectric | WAT | 0.5 | OP |
| 4 | Conventional Hydroelectric | WAT | 0.5 | OP |
| 5 | Conventional Hydroelectric | WAT | 0.5 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
62747
Sector
IPP Non-CHP
Water source
Kentucky River
Data edition
2024-final