MWPowerPlantFacts
EIA plant 62747

Ravenna · Estill · KY

Matilda Hamilton Fee Hydroelectric Stati

Operated by Lock 12 Hydro Partners, LLC

Annual generation7,981 MWhSum of represented EIA-923 rows
Fuel codesWATCodes retained from EIA records
Grid contextPJM Interconnection, LLCBalancing authority or NERC region

Published location

Where is Matilda Hamilton Fee Hydroelectric Stati?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

37.677484, -83.948553

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
1744 MWh
2850 MWh
3962 MWh
4909 MWh
5928 MWh
6567 MWh
7442 MWh
8515 MWh
9287 MWh
10404 MWh
11524 MWh
12849 MWh

Operating generators

IDTechnologyFuelMWStatus
1Conventional HydroelectricWAT0.5OP
2Conventional HydroelectricWAT0.5OP
3Conventional HydroelectricWAT0.5OP
4Conventional HydroelectricWAT0.5OP
5Conventional HydroelectricWAT0.5OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
62747
Sector
IPP Non-CHP
Water source
Kentucky River
Data edition
2024-final