EIA plant 62747

Ravenna · Estill · KY

Matilda Hamilton Fee Hydroelectric Stati

Operated by Lock 12 Hydro Partners, LLC

Annual generation7,981 MWhSum of represented EIA-923 rows
Fuel codesWATCodes retained from EIA records
Grid contextPJM Interconnection, LLCBalancing authority or NERC region

Published location

Where is Matilda Hamilton Fee Hydroelectric Stati?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

37.677484, -83.948553

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyConventional Hydroelectric2.5 MW represented

Grouped from this plant’s represented generator records. Use the KY plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1744
2850
3962
4909
5928
6567
7442
8515
9287
10404
11524
12849

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1744
2850
3962
4909
5928
6567
7442
8515
9287
10404
11524
12849

2024 monthly net generation

MonthNet generation
1744 MWh
2850 MWh
3962 MWh
4909 MWh
5928 MWh
6567 MWh
7442 MWh
8515 MWh
9287 MWh
10404 MWh
11524 MWh
12849 MWh

Operating generators

IDTechnologyFuelMWStatus
1Conventional HydroelectricWAT0.5OP
2Conventional HydroelectricWAT0.5OP
3Conventional HydroelectricWAT0.5OP
4Conventional HydroelectricWAT0.5OP
5Conventional HydroelectricWAT0.5OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
62747
Sector
IPP Non-CHP
Water source
Kentucky River
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Matilda Hamilton Fee Hydroelectric Stati power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Matilda Hamilton Fee Hydroelectric Stati

Variation in the published months

Across 12 numeric monthly generation entries, 3 has the highest recorded value (962 MWh) and 9 the lowest (287 MWh). Their difference is 675 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
1Conventional Hydroelectric0.50.50.50.1
2Conventional Hydroelectric0.50.50.50.1
3Conventional Hydroelectric0.50.50.50.1
4Conventional Hydroelectric0.50.50.50.1
5Conventional Hydroelectric0.50.50.50.1

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.