MWPowerPlantFacts
EIA plant 62804

Fort Stockton · Pecos · TX

Greasewood Solar

Operated by Concho Bluff LLC

Annual generation168,806 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextElectric Reliability Council of Texas, Inc.Balancing authority or NERC region

Published location

Where is Greasewood Solar?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

31.030996, -102.488209

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
112,756 MWh
210,741 MWh
314,472 MWh
414,844 MWh
516,709 MWh
68,421 MWh
77,525 MWh
813,873 MWh
916,197 MWh
1020,444 MWh
1113,239 MWh
1219,585 MWh

Operating generators

IDTechnologyFuelMWStatus
GREA1Solar PhotovoltaicSUN255OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
62804
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final