Georgetown · Sussex · DE

DEC Phase II at Georgetown

Operated by Luminace Solar MC, LLC

Annual generation5,373 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextPJM Interconnection, LLCBalancing authority or NERC region

Published location

Where is DEC Phase II at Georgetown?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

38.664989, -75.399444

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic3 MW represented

Grouped from this plant’s represented generator records. Use the DE plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1276
2419
3491
4502
5435
6637
7374
8552
9444
10534
11388
12321

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1276
2419
3491
4502
5435
6637
7374
8552
9444
10534
11388
12321

2024 monthly net generation

MonthNet generation
1276 MWh
2419 MWh
3491 MWh
4502 MWh
5435 MWh
6637 MWh
7374 MWh
8552 MWh
9444 MWh
10534 MWh
11388 MWh
12321 MWh

Operating generators

IDTechnologyFuelMWStatus
DECIISolar PhotovoltaicSUN3OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
63392
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right DEC Phase II at Georgetown power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at DEC Phase II at Georgetown

Variation in the published months

Across 12 numeric monthly generation entries, 6 has the highest recorded value (637 MWh) and 1 the lowest (276 MWh). Their difference is 361 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
DECIISolar Photovoltaic3.03.03.0Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check