PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/63468
EIA plant 63468
Uxbridge · Worcester · MA
Hurteau Solar Project Hybrid
Operated by AES Distributed Energy
Published location
Where is Hurteau Solar Project Hybrid?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
42.024800, -71.592500
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 49 MWh |
| 2 | 198 MWh |
| 3 | 257 MWh |
| 4 | 308 MWh |
| 5 | 346 MWh |
| 6 | 381 MWh |
| 7 | 338 MWh |
| 8 | 339 MWh |
| 9 | 273 MWh |
| 10 | 274 MWh |
| 11 | 183 MWh |
| 12 | 80 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| HURTU | Solar Photovoltaic | SUN | 2 | OP |
| BATT | Batteries | MWH | 1.3 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
63468
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final