MWPowerPlantFacts

Data last collected:

EIA plant 63498

Shirley · Suffolk · NY

Calabro Airport South Solar Project

Operated by CVI Renewables Holdings, LLC.

Annual generation2,168 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextNew York Independent System OperatorBalancing authority or NERC region

Published location

Where is Calabro Airport South Solar Project?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

40.811524, -72.857053

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic1.2 MW represented

Grouped from this plant’s represented generator records. Use the NY plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

182
2150
3199
4205
5224
6268
7186
8235
9192
10159
11152
12116

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
182
2150
3199
4205
5224
6268
7186
8235
9192
10159
11152
12116

2024 monthly net generation

MonthNet generation
182 MWh
2150 MWh
3199 MWh
4205 MWh
5224 MWh
6268 MWh
7186 MWh
8235 MWh
9192 MWh
10159 MWh
11152 MWh
12116 MWh

Operating generators

IDTechnologyFuelMWStatus
SOUTHSolar PhotovoltaicSUN1.2OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
63498
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Calabro Airport South Solar Project power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Calabro Airport South Solar Project

Variation in the published months

Across 12 numeric monthly generation entries, 6 has the highest recorded value (268 MWh) and 1 the lowest (82 MWh). Their difference is 186 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
SOUTHSolar Photovoltaic1.21.21.2Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check