PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/63616
EIA plant 63616
Fountain Valley · Orange · CA
OCSD
Operated by Hybrid-Electric Building Technologies West Los Angeles 1, LLC
Published location
Where is OCSD?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
33.693129, -117.940900
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | -13 MWh |
| 2 | -18 MWh |
| 3 | -22 MWh |
| 4 | -45 MWh |
| 5 | -45 MWh |
| 6 | -45 MWh |
| 7 | -45 MWh |
| 8 | -45 MWh |
| 9 | -45 MWh |
| 10 | -66 MWh |
| 11 | -31 MWh |
| 12 | -26 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| OCSD1 | Batteries | MWH | 4.9 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
63616
Sector
Commercial Non-CHP
Water source
Unavailable
Data edition
2024-final