MWPowerPlantFacts
EIA plant 64106

Desert Center · Riverside · CA

Maverick Solar 7, LLC

Operated by Maverick Solar 7, LLC

Annual generation300,995 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Maverick Solar 7, LLC?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

33.700000, -115.380000

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
115,384 MWh
215,506 MWh
310,963 MWh
421,670 MWh
532,323 MWh
640,588 MWh
739,649 MWh
836,072 MWh
930,895 MWh
1021,804 MWh
1118,506 MWh
1217,635 MWh

Operating generators

IDTechnologyFuelMWStatus
MAV05Solar PhotovoltaicSUN132OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
64106
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final