MWPowerPlantFacts
EIA plant 64391

Paso Robles · San Luis Obispo · CA

Firestone Walker Brewery - Phase 1

Operated by SkyHigh 2 Solar

Annual generation3,336 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Firestone Walker Brewery - Phase 1?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

35.595877, -120.694306

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
1168 MWh
2172 MWh
3273 MWh
4322 MWh
5358 MWh
6345 MWh
7385 MWh
8377 MWh
9299 MWh
10269 MWh
11191 MWh
12177 MWh

Operating generators

IDTechnologyFuelMWStatus
FWBP1Solar PhotovoltaicSUN1.6OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
64391
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final