PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/64402
EIA plant 64402
Placerville · El Dorado · CA
El Dorado County
Operated by SkyHigh 2 Solar
Published location
Where is El Dorado County?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
38.698145, -120.828256
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 116 MWh |
| 2 | 150 MWh |
| 3 | 227 MWh |
| 4 | 294 MWh |
| 5 | 358 MWh |
| 6 | 353 MWh |
| 7 | 342 MWh |
| 8 | 314 MWh |
| 9 | 277 MWh |
| 10 | 224 MWh |
| 11 | 150 MWh |
| 12 | 119 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| ELDCO | Solar Photovoltaic | SUN | 1.5 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
64402
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final