MWPowerPlantFacts

Data last collected:

EIA plant 64547

Springfield · Sarpy · NE

Turtle Creek

Operated by Omaha Public Power District

Annual generation20,983 MWhSum of represented EIA-923 rows
Fuel codesUnavailableCodes retained from EIA records
Grid contextSouthwest Power PoolBalancing authority or NERC region

Published location

Where is Turtle Creek?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

41.092238, -96.168308

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

119,927
1211,056

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 2 of 2 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
119,927
1211,056

2024 monthly net generation

MonthNet generation
119,927 MWh
1211,056 MWh

Operating generators

IDTechnologyFuelMWStatus

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
64547
Sector
Electric Utility
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Turtle Creek power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Turtle Creek

Variation in the published months

Across 2 numeric monthly generation entries, 12 has the highest recorded value (11,056 MWh) and 11 the lowest (9,927 MWh). Their difference is 1,129 MWh. Missing months have not been treated as zero.

Power plant research

Before you decide, check these points against the current source.

Things to check