MWPowerPlantFacts
EIA plant 64601

San Diego · San Diego · CA

County of San Diego COC Hybrid

Operated by Solar Star California LXXVIII, LLC

Annual generation3,093 MWhSum of represented EIA-923 rows
Fuel codesMWH, SUNCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is County of San Diego COC Hybrid?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

32.833645, -117.131123

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
1168 MWh
2177 MWh
3278 MWh
4325 MWh
5326 MWh
6342 MWh
7345 MWh
8323 MWh
9239 MWh
10234 MWh
11188 MWh
12148 MWh

Operating generators

IDTechnologyFuelMWStatus
PVSolar PhotovoltaicSUN1.7OP
ESSBatteriesMWH0.4OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
64601
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final