MWPowerPlantFacts

Data last collected:

EIA plant 64867

Lockport · Niagara · NY

Slayton Settlement Road Solar CSG

Operated by RPNY Solar 3, LLC

Annual generation8,829 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextNew York Independent System OperatorBalancing authority or NERC region

Published location

Where is Slayton Settlement Road Solar CSG?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

43.203558, -78.645433

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic7 MW represented

Grouped from this plant’s represented generator records. Use the NY plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

13
287
3609
4889
51,041
61,318
71,600
81,329
9961
10286
11421
12285

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
13
287
3609
4889
51,041
61,318
71,600
81,329
9961
10286
11421
12285

2024 monthly net generation

MonthNet generation
13 MWh
287 MWh
3609 MWh
4889 MWh
51,041 MWh
61,318 MWh
71,600 MWh
81,329 MWh
9961 MWh
10286 MWh
11421 MWh
12285 MWh

Operating generators

IDTechnologyFuelMWStatus
SLYTASolar PhotovoltaicSUN5OP
SLYTBSolar PhotovoltaicSUN2OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
64867
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Slayton Settlement Road Solar CSG power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Slayton Settlement Road Solar CSG

Variation in the published months

Across 12 numeric monthly generation entries, 7 has the highest recorded value (1,600 MWh) and 1 the lowest (3 MWh). Their difference is 1,597 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
SLYTASolar Photovoltaic5.05.05.0Not supplied
SLYTBSolar Photovoltaic2.02.02.0Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check