MWPowerPlantFacts

Data last collected:

EIA plant 65185

Tucson · Pima · AZ

Broadway 3 - Tucson Phase I

Operated by MN8 Energy LLC

Annual generation1,628 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextTucson Electric Power CompanyBalancing authority or NERC region

Published location

Where is Broadway 3 - Tucson Phase I?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

32.248170, -111.261110

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic1 MW represented

Grouped from this plant’s represented generator records. Use the AZ plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

179
292
3155
4191
5197
6154
7177
8159
9116
10109
11113
1286

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
179
292
3155
4191
5197
6154
7177
8159
9116
10109
11113
1286

2024 monthly net generation

MonthNet generation
179 MWh
292 MWh
3155 MWh
4191 MWh
5197 MWh
6154 MWh
7177 MWh
8159 MWh
9116 MWh
10109 MWh
11113 MWh
1286 MWh

Operating generators

IDTechnologyFuelMWStatus
GEN1Solar PhotovoltaicSUN1OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
65185
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Broadway 3 - Tucson Phase I power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Broadway 3 - Tucson Phase I

Variation in the published months

Across 12 numeric monthly generation entries, 5 has the highest recorded value (197 MWh) and 1 the lowest (79 MWh). Their difference is 118 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
GEN1Solar Photovoltaic1.01.01.0Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check