MWPowerPlantFacts

Data last collected:

EIA plant 65614

Costa Mesa · Orange · CA

Orange Coast College PH2 Solar Project

Operated by Solar Star Coastal Pirate, LLC

Annual generation4,034 MWhSum of represented EIA-923 rows
Fuel codesMWH, SUNCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Orange Coast College PH2 Solar Project?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

33.672565, -117.912460

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic3.1 MW represented
TechnologyBatteries2.1 MW represented

Grouped from this plant’s represented generator records. Use the CA plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1255
2235
3372
4403
5371
6398
7461
8439
9347
10306
11260
12187

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1255
2235
3372
4403
5371
6398
7461
8439
9347
10306
11260
12187

2024 monthly net generation

MonthNet generation
1255 MWh
2235 MWh
3372 MWh
4403 MWh
5371 MWh
6398 MWh
7461 MWh
8439 MWh
9347 MWh
10306 MWh
11260 MWh
12187 MWh

Operating generators

IDTechnologyFuelMWStatus
OCCSPSolar PhotovoltaicSUN3.1OP
OCCBABatteriesMWH2.1OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
65614
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Orange Coast College PH2 Solar Project power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Orange Coast College PH2 Solar Project

Variation in the published months

Across 12 numeric monthly generation entries, 7 has the highest recorded value (461 MWh) and 12 the lowest (187 MWh). Their difference is 274 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
OCCBABatteries2.12.12.1Not supplied
OCCSPSolar Photovoltaic3.13.02.7Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check