MWPowerPlantFacts

Data last collected:

EIA plant 65653

Westminster · Worcester · MA

TES Rowtier

Operated by SkyHigh 2 Solar

Annual generation5,059 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextISO New England Inc.Balancing authority or NERC region

Published location

Where is TES Rowtier?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

42.541925, -71.856700

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic3 MW represented

Grouped from this plant’s represented generator records. Use the MA plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1114
2393
3372
4514
5486
6569
7612
8477
9374
10505
11366
12277

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1114
2393
3372
4514
5486
6569
7612
8477
9374
10505
11366
12277

2024 monthly net generation

MonthNet generation
1114 MWh
2393 MWh
3372 MWh
4514 MWh
5486 MWh
6569 MWh
7612 MWh
8477 MWh
9374 MWh
10505 MWh
11366 MWh
12277 MWh

Operating generators

IDTechnologyFuelMWStatus
NBRIASolar PhotovoltaicSUN3OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
65653
Sector
IPP Non-CHP
Water source
NA
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right TES Rowtier power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at TES Rowtier

Variation in the published months

Across 12 numeric monthly generation entries, 7 has the highest recorded value (612 MWh) and 1 the lowest (114 MWh). Their difference is 498 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
NBRIASolar Photovoltaic3.03.03.0Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check