MWPowerPlantFacts
EIA plant 66022

Monee · Will · IL

Amazon MDW7 Solar Project

Operated by Solar Star Prime 6, LLC

Annual generation3,068 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextMidcontinent Independent Transmission System Operator, Inc..Balancing authority or NERC region

Published location

Where is Amazon MDW7 Solar Project?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

41.424123, -87.772832

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
167 MWh
2267 MWh
3136 MWh
463 MWh
5404 MWh
6393 MWh
7400 MWh
8396 MWh
9342 MWh
10335 MWh
11150 MWh
12115 MWh

Operating generators

IDTechnologyFuelMWStatus
AMDW7Solar PhotovoltaicSUN1.9OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
66022
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final