PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/66022
EIA plant 66022
Monee · Will · IL
Amazon MDW7 Solar Project
Operated by Solar Star Prime 6, LLC
Published location
Where is Amazon MDW7 Solar Project?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
41.424123, -87.772832
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 67 MWh |
| 2 | 267 MWh |
| 3 | 136 MWh |
| 4 | 63 MWh |
| 5 | 404 MWh |
| 6 | 393 MWh |
| 7 | 400 MWh |
| 8 | 396 MWh |
| 9 | 342 MWh |
| 10 | 335 MWh |
| 11 | 150 MWh |
| 12 | 115 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| AMDW7 | Solar Photovoltaic | SUN | 1.9 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
66022
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final