MWPowerPlantFacts

Data last collected:

EIA plant 66039

San Bernardino · San Bernardino · CA

IGS SBD2

Operated by Greenbacker Renewable Energy Corporation

Annual generation4,840 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextLos Angeles Department of Water and PowerBalancing authority or NERC region

Published location

Where is IGS SBD2?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

34.073555, -117.281419

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic2.5 MW represented

Grouped from this plant’s represented generator records. Use the CA plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1291
2275
3403
4481
5505
6481
7505
8484
9419
10394
11328
12274

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1291
2275
3403
4481
5505
6481
7505
8484
9419
10394
11328
12274

2024 monthly net generation

MonthNet generation
1291 MWh
2275 MWh
3403 MWh
4481 MWh
5505 MWh
6481 MWh
7505 MWh
8484 MWh
9419 MWh
10394 MWh
11328 MWh
12274 MWh

Operating generators

IDTechnologyFuelMWStatus
457Solar PhotovoltaicSUN2.5OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
66039
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right IGS SBD2 power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at IGS SBD2

Variation in the published months

Across 12 numeric monthly generation entries, 5, 7 has the highest recorded value (505 MWh) and 12 the lowest (274 MWh). Their difference is 231 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
457Solar Photovoltaic2.52.52.5Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check