PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/66129
EIA plant 66129
Dover · Hillsborough · FL
Dover Solar and Battery Storage
Operated by Tampa Electric Co
Published location
Where is Dover Solar and Battery Storage?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
27.955865, -82.201381
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 2,858 MWh |
| 2 | 4,566 MWh |
| 3 | 4,940 MWh |
| 4 | 6,265 MWh |
| 5 | 6,712 MWh |
| 6 | 5,778 MWh |
| 7 | 5,179 MWh |
| 8 | 4,003 MWh |
| 9 | 3,370 MWh |
| 10 | 1,721 MWh |
| 11 | 2,411 MWh |
| 12 | 2,485 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | SUN | 25 | OP |
| BESS1 | Batteries | MWH | 15 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
66129
Sector
Electric Utility
Water source
Unavailable
Data edition
2024-final