MWPowerPlantFacts

Data last collected:

EIA plant 66245

Lewiston · Androscoggin · ME

Merrill Road Solar

Operated by NextGrid Mangrove, LLC

Annual generation6,516 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextISO New England Inc.Balancing authority or NERC region

Published location

Where is Merrill Road Solar?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

44.157920, -70.197138

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic4.6 MW represented

Grouped from this plant’s represented generator records. Use the ME plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1101
2477
3530
4557
5690
6766
7856
8744
9711
10566
11332
12186

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1101
2477
3530
4557
5690
6766
7856
8744
9711
10566
11332
12186

2024 monthly net generation

MonthNet generation
1101 MWh
2477 MWh
3530 MWh
4557 MWh
5690 MWh
6766 MWh
7856 MWh
8744 MWh
9711 MWh
10566 MWh
11332 MWh
12186 MWh

Operating generators

IDTechnologyFuelMWStatus
MRLRDSolar PhotovoltaicSUN4.6OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
66245
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Merrill Road Solar power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Merrill Road Solar

Variation in the published months

Across 12 numeric monthly generation entries, 7 has the highest recorded value (856 MWh) and 1 the lowest (101 MWh). Their difference is 755 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
MRLRDSolar Photovoltaic4.64.64.6Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check