MWPowerPlantFacts

Data last collected:

EIA plant 66339

Brainerd · Crow Wing · MN

Brainerd Airport

Operated by AEP Onsite Partners, LLC

Annual generation9,958 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextMidcontinent Independent Transmission System Operator, Inc..Balancing authority or NERC region

Published location

Where is Brainerd Airport?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

46.390960, -94.140540

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic5.8 MW represented

Grouped from this plant’s represented generator records. Use the MN plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1204
2612
3947
41,018
51,249
61,221
71,353
81,068
91,139
10715
11261
12171

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1204
2612
3947
41,018
51,249
61,221
71,353
81,068
91,139
10715
11261
12171

2024 monthly net generation

MonthNet generation
1204 MWh
2612 MWh
3947 MWh
41,018 MWh
51,249 MWh
61,221 MWh
71,353 MWh
81,068 MWh
91,139 MWh
10715 MWh
11261 MWh
12171 MWh

Operating generators

IDTechnologyFuelMWStatus
BRN01Solar PhotovoltaicSUN5.8OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
66339
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Brainerd Airport power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Brainerd Airport

Variation in the published months

Across 12 numeric monthly generation entries, 7 has the highest recorded value (1,353 MWh) and 12 the lowest (171 MWh). Their difference is 1,182 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
BRN01Solar Photovoltaic5.85.85.8Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check