MWPowerPlantFacts

Data last collected:

EIA plant 66469

Clovis · Fresno · CA

Clovis East High School

Operated by Tesla Inc.

Annual generation1,480 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Clovis East High School?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

36.799669, -119.640598

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic1 MW represented

Grouped from this plant’s represented generator records. Use the CA plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

155
282
3123
4160
5202
6192
7183
8163
9127
1089
1161
1243

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
155
282
3123
4160
5202
6192
7183
8163
9127
1089
1161
1243

2024 monthly net generation

MonthNet generation
155 MWh
282 MWh
3123 MWh
4160 MWh
5202 MWh
6192 MWh
7183 MWh
8163 MWh
9127 MWh
1089 MWh
1161 MWh
1243 MWh

Operating generators

IDTechnologyFuelMWStatus
PV1Solar PhotovoltaicSUN1OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
66469
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Clovis East High School power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Clovis East High School

Variation in the published months

Across 12 numeric monthly generation entries, 5 has the highest recorded value (202 MWh) and 12 the lowest (43 MWh). Their difference is 159 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
PV1Solar Photovoltaic1.01.01.0Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check