MWPowerPlantFacts
EIA plant 66492

Dos Palos · Merced · CA

Henry Miller RD

Operated by Henry Miller Reclamation District

Annual generation3,203 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Henry Miller RD?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

37.054300, -120.635230

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
1140 MWh
2196 MWh
3285 MWh
4323 MWh
5357 MWh
6357 MWh
7362 MWh
8338 MWh
9285 MWh
10235 MWh
11191 MWh
12134 MWh

Operating generators

IDTechnologyFuelMWStatus
HMRD1Solar PhotovoltaicSUN1.5OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
66492
Sector
Commercial Non-CHP
Water source
Unavailable
Data edition
2024-final