MWPowerPlantFacts

Data last collected:

EIA plant 67194

Bristol · Lincoln · ME

ME - EDFR - Phase I - Bristol

Operated by Overlook Solar Partners, LLC

Annual generation5,768 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextISO New England Inc.Balancing authority or NERC region

Published location

Where is ME - EDFR - Phase I - Bristol?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

43.965641, -69.518107

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic5 MW represented

Grouped from this plant’s represented generator records. Use the ME plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

10
2349
3680
4613
5648
6719
7779
8633
9548
10694
11105
120

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
10
2349
3680
4613
5648
6719
7779
8633
9548
10694
11105
120

2024 monthly net generation

MonthNet generation
10 MWh
2349 MWh
3680 MWh
4613 MWh
5648 MWh
6719 MWh
7779 MWh
8633 MWh
9548 MWh
10694 MWh
11105 MWh
120 MWh

Operating generators

IDTechnologyFuelMWStatus
BRISTSolar PhotovoltaicSUN5OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
67194
Sector
IPP Non-CHP
Water source
NA
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right ME - EDFR - Phase I - Bristol power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at ME - EDFR - Phase I - Bristol

Variation in the published months

Across 12 numeric monthly generation entries, 7 has the highest recorded value (779 MWh) and 1, 12 the lowest (0 MWh). Their difference is 779 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
BRISTSolar Photovoltaic5.05.05.0Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check