MWPowerPlantFacts

Data last collected:

EIA plant 68622

Statesboro · Bulloch · GA

Bulloch Rushing

Operated by Westbound Solar 3, LLC

Annual generation6,384 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextSouthern Company Services, Inc. - TransBalancing authority or NERC region

Published location

Where is Bulloch Rushing?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

32.403553, -81.749943

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic2.9 MW represented

Grouped from this plant’s represented generator records. Use the GA plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1401
2451
3531
4674
5669
6731
7689
8641
9402
10512
11343
12340

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1401
2451
3531
4674
5669
6731
7689
8641
9402
10512
11343
12340

2024 monthly net generation

MonthNet generation
1401 MWh
2451 MWh
3531 MWh
4674 MWh
5669 MWh
6731 MWh
7689 MWh
8641 MWh
9402 MWh
10512 MWh
11343 MWh
12340 MWh

Operating generators

IDTechnologyFuelMWStatus
BRUSHSolar PhotovoltaicSUN2.9OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
68622
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Bulloch Rushing power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Bulloch Rushing

Variation in the published months

Across 12 numeric monthly generation entries, 6 has the highest recorded value (731 MWh) and 12 the lowest (340 MWh). Their difference is 391 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
BRUSHSolar Photovoltaic2.92.92.9Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check