MWPowerPlantFacts

Data last collected:

EIA plant 758

Blairsville · Union · GA

Nottely

Operated by Tennessee Valley Authority

Annual generation25,657 MWhSum of represented EIA-923 rows
Fuel codesWATCodes retained from EIA records
Grid contextTennessee Valley AuthorityBalancing authority or NERC region

Published location

Where is Nottely?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

34.959153, -84.087650

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyConventional Hydroelectric15.9 MW represented

Grouped from this plant’s represented generator records. Use the GA plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

14,632
23,984
31,891
4-449
5783
61,978
72,496
82,405
92,421
102,604
111,014
121,898

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
14,632
23,984
31,891
4-449
5783
61,978
72,496
82,405
92,421
102,604
111,014
121,898

2024 monthly net generation

MonthNet generation
14,632 MWh
23,984 MWh
31,891 MWh
4-449 MWh
5783 MWh
61,978 MWh
72,496 MWh
82,405 MWh
92,421 MWh
102,604 MWh
111,014 MWh
121,898 MWh

Operating generators

IDTechnologyFuelMWStatus
1Conventional HydroelectricWAT15OP
2Conventional HydroelectricWAT0.9OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
758
Sector
Electric Utility
Water source
Nottely River
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Nottely power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Nottely

Variation in the published months

Across 11 numeric monthly generation entries, 1 has the highest recorded value (4,632 MWh) and 5 the lowest (783 MWh). Their difference is 3,849 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
1Conventional Hydroelectric15.019.218.413.6
2Conventional Hydroelectric0.90.90.90.6

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check