EIA plant 54236

Groton · New London · CT

Pfizer Groton Plant

Operated by Pfizer Inc

Annual generation77,685 MWhSum of represented EIA-923 rows
Fuel codesNGCodes retained from EIA records
Grid contextISO New England Inc.Balancing authority or NERC region

Published location

Where is Pfizer Groton Plant?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

41.331500, -72.078600

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologyNatural Gas Steam Turbine27.5 MW represented
TechnologyNatural Gas Fired Combustion Turbine10 MW represented

Grouped from this plant’s represented generator records. Use the CT plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

15,475.61
25,726.24
35,948.59
46,218.88
54,729.73
67,096.96
78,119.1
86,980.15
97,075.51
106,415.86
116,861.34
127,036.67

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
15,475.61
25,726.24
35,948.59
46,218.88
54,729.73
67,096.96
78,119.1
86,980.15
97,075.51
106,415.86
116,861.34
127,036.67

2024 monthly net generation

MonthNet generation
15,476 MWh
25,726 MWh
35,949 MWh
46,219 MWh
54,730 MWh
67,097 MWh
78,119 MWh
86,980 MWh
97,076 MWh
106,416 MWh
116,861 MWh
127,037 MWh

Operating generators

IDTechnologyFuelMWStatus
GT-1Natural Gas Fired Combustion TurbineNG10OP
TG 3Natural Gas Steam TurbineNG10OP
TG 4Natural Gas Steam TurbineNG10OP
TG5Natural Gas Steam TurbineNG7.5OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
54236
Sector
Industrial CHP
Water source
Thames River
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Pfizer Groton Plant power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Pfizer Groton Plant

Variation in the published months

Across 12 numeric monthly generation entries, 7 has the highest recorded value (8,119 MWh) and 5 the lowest (4,730 MWh). Their difference is 3,389 MWh. Missing months have not been treated as zero.

Reading the MW column

In the 4 numeric rows displayed in this table, MW ranges from 7.5 (TG5) to 10 (GT-1, TG 3, TG 4). The difference is 2.5 in the column's stated units. This summary covers the displayed rows and retains the table's period and scope.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
GT-1Natural Gas Fired Combustion Turbine10.09.510.54.5
TG 3Natural Gas Steam Turbine10.010.010.00.8
TG 4Natural Gas Steam Turbine10.05.05.00.8
TG5Natural Gas Steam Turbine7.57.57.50.5

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check