MWPowerPlantFacts
EIA plant 54343

Lemon Cove · Tulare · CA

Terminus Hydroelectric Project

Operated by Eagle Creek Renewable Energy, LLC

Annual generation9,790 MWhSum of represented EIA-923 rows
Fuel codesWATCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is Terminus Hydroelectric Project?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

36.415600, -119.006900

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
10 MWh
22,633 MWh
31,460 MWh
40 MWh
50 MWh
65,697 MWh
70 MWh
80 MWh
90 MWh
100 MWh
110 MWh
120 MWh

Operating generators

IDTechnologyFuelMWStatus
GEN1Conventional HydroelectricWAT20.1OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
54343
Sector
IPP Non-CHP
Water source
Lake Kaweah
Data edition
2024-final