MWPowerPlantFacts
EIA plant 59475

Perryton · Ochiltree · TX

Palo Duro Wind

Operated by Palo Duro Wind

Annual generation1,016,222 MWhSum of represented EIA-923 rows
Fuel codesWNDCodes retained from EIA records
Grid contextSouthwest Power PoolBalancing authority or NERC region

Published location

Where is Palo Duro Wind?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

36.243889, -101.001389

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
179,064 MWh
287,935 MWh
3103,566 MWh
499,883 MWh
585,263 MWh
698,193 MWh
792,368 MWh
874,754 MWh
984,673 MWh
1091,285 MWh
1183,217 MWh
1236,021 MWh

Operating generators

IDTechnologyFuelMWStatus
GE1.7Onshore Wind TurbineWND249.9OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
59475
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final