MWPowerPlantFacts
EIA plant 60981

Five Points · Fresno · CA

NextEra Westside PV

Operated by Westside Solar, LLC

Annual generation40,622 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextCalifornia Independent System OperatorBalancing authority or NERC region

Published location

Where is NextEra Westside PV?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

36.381775, -120.134486

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

2024 monthly net generation

MonthNet generation
11,982 MWh
22,590 MWh
32,786 MWh
43,315 MWh
54,302 MWh
65,062 MWh
75,687 MWh
85,022 MWh
93,183 MWh
102,454 MWh
112,268 MWh
121,971 MWh

Operating generators

IDTechnologyFuelMWStatus
WS526Solar PhotovoltaicSUN20OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
60981
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final