MWPowerPlantFacts

Data last collected:

EIA plant 64411

Delanco Township · Burlington · NJ

Delanco

Operated by Delanco Coopertown Rd Solar 2, LLC

Annual generation4,222 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextPJM Interconnection, LLCBalancing authority or NERC region

Published location

Where is Delanco?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

40.049360, -74.935300

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic2.4 MW represented

Grouped from this plant’s represented generator records. Use the NJ plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

1136
2341
3374
4380
5384
6459
7447
8425
9352
10439
11286
12199

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
1136
2341
3374
4380
5384
6459
7447
8425
9352
10439
11286
12199

2024 monthly net generation

MonthNet generation
1136 MWh
2341 MWh
3374 MWh
4380 MWh
5384 MWh
6459 MWh
7447 MWh
8425 MWh
9352 MWh
10439 MWh
11286 MWh
12199 MWh

Operating generators

IDTechnologyFuelMWStatus
DELANSolar PhotovoltaicSUN2.4OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
64411
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right Delanco power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at Delanco

Variation in the published months

Across 12 numeric monthly generation entries, 6 has the highest recorded value (459 MWh) and 1 the lowest (136 MWh). Their difference is 323 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
DELANSolar Photovoltaic2.42.42.4Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.

Power plant research

Before you decide, check these points against the current source.

Things to check