EIA plant 68615

Roseland · Essex · NJ

ADP Roseland, NJ

Operated by ADP Boulevard Solar Project 2021, LLC

Annual generation1,049 MWhSum of represented EIA-923 rows
Fuel codesSUNCodes retained from EIA records
Grid contextPJM Interconnection, LLCBalancing authority or NERC region

Published location

Where is ADP Roseland, NJ?

This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.

40.815661, -74.310147

Open the interactive map ↗
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.

Equipment mix

Operating capacity by technology

TechnologySolar Photovoltaic2.4 MW represented

Grouped from this plant’s represented generator records. Use the NJ plant index for regional peers.

See the evidence

Electricity output across the year

Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.

10
20
35
462
577
6215
7317
856
90
1067
11146
12104

MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.

Read the chart as a table
Electricity output across the year — MWh net generation
RecordMWh net generation
10
20
35
462
577
6215
7317
856
90
1067
11146
12104

2024 monthly net generation

MonthNet generation
10 MWh
20 MWh
35 MWh
462 MWh
577 MWh
6215 MWh
7317 MWh
856 MWh
90 MWh
1067 MWh
11146 MWh
12104 MWh

Operating generators

IDTechnologyFuelMWStatus
5663Solar PhotovoltaicSUN2.4OP

Continue exploring

Similar-capacity plants in the same state

Identity, technology and limitations
EIA plant ID
68615
Sector
IPP Non-CHP
Water source
Unavailable
Data edition
2024-final

Use this record

Questions this evidence can answer

01What exactly is this record?

Use the name, place, date and identifiers above to confirm that you have the right ADP Roseland, NJ power plant: capacity and generation | PowerPlantFacts record.

02What does the evidence establish?

Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.

03What should I verify next?

Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.

A closer look at ADP Roseland, NJ

Variation in the published months

Across 12 numeric monthly generation entries, 7 has the highest recorded value (317 MWh) and 1, 2, 9 the lowest (0 MWh). Their difference is 317 MWh. Missing months have not been treated as zero.

Generator capacity in different operating conditions

Generator IDTechnologyNameplate MWSummer MWWinter MWMinimum load MW
5663Solar Photovoltaic2.42.42.4Not supplied

EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.

Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.