PowerPlantFactsEvidence report · prepared 2 September 2026https://powerplantfacts.com/entity/3887
EIA plant 3887
Mattawa · Grant · WA
Priest Rapids
Operated by PUD No 2 of Grant County
Published location
Where is Priest Rapids?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
46.645100, -119.908000
Open the interactive map ↗Map data © OpenStreetMap contributors
Capacity is not generation. Nameplate MW describes equipment; annual MWh describes recorded output. Proposed and retired units are not added to operating capacity.
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 320,657 MWh |
| 2 | 265,248 MWh |
| 3 | 323,742 MWh |
| 4 | 253,477 MWh |
| 5 | 327,172 MWh |
| 6 | 385,159 MWh |
| 7 | 377,191 MWh |
| 8 | 344,167 MWh |
| 9 | 249,275 MWh |
| 10 | 248,643 MWh |
| 11 | 330,525 MWh |
| 12 | 412,517 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | WAT | 95 | OP |
| 10 | Conventional Hydroelectric | WAT | 95 | OP |
| 2 | Conventional Hydroelectric | WAT | 95 | OP |
| 3 | Conventional Hydroelectric | WAT | 95 | OP |
| 4 | Conventional Hydroelectric | WAT | 95 | OP |
| 5 | Conventional Hydroelectric | WAT | 95 | OP |
| 6 | Conventional Hydroelectric | WAT | 95 | OP |
| 7 | Conventional Hydroelectric | WAT | 95 | OP |
| 8 | Conventional Hydroelectric | WAT | 95 | OP |
| 9 | Conventional Hydroelectric | WAT | 95 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
EIA plant ID
3887
Sector
Electric Utility
Water source
Columbia River
Data edition
2024-final