Data last collected:
Brownsville · Haywood · TN
Lagoon Creek
Operated by Tennessee Valley Authority
Published location
Where is Lagoon Creek?
This locator uses the coordinates in the approved source record. It shows geographic context, not a site boundary, safety zone or property-risk area.
35.657800, -89.396400
Open the interactive map ↗Map data © OpenStreetMap contributors
Equipment mix
Operating capacity by technology
Grouped from this plant’s represented generator records. Use the TN plant index for regional peers.
See the evidence
Electricity output across the year
Monthly net generation shows the seasonal shape of this plant's represented output. A negative value is retained when the source reports net consumption.
MWh net generation · 2024 final edition · EIA 923 represented operating rows. 12 of 12 supplied rows shown; 0 missing values omitted. Months with no reported numeric value are omitted, not treated as zero.
Read the chart as a table
| Record | MWh net generation |
|---|---|
| 1 | 395,502 |
| 2 | 325,623 |
| 3 | 336,954 |
| 4 | 262,108 |
| 5 | 121,553 |
| 6 | 260,702 |
| 7 | 352,308 |
| 8 | 390,409 |
| 9 | 371,334 |
| 10 | 342,296 |
| 11 | 32,009 |
| 12 | 308,838 |
2024 monthly net generation
| Month | Net generation |
|---|---|
| 1 | 395,502 MWh |
| 2 | 325,623 MWh |
| 3 | 336,954 MWh |
| 4 | 262,108 MWh |
| 5 | 121,553 MWh |
| 6 | 260,702 MWh |
| 7 | 352,308 MWh |
| 8 | 390,409 MWh |
| 9 | 371,334 MWh |
| 10 | 342,296 MWh |
| 11 | 32,009 MWh |
| 12 | 308,838 MWh |
Operating generators
| ID | Technology | Fuel | MW | Status |
|---|---|---|---|---|
| STG1 | Natural Gas Fired Combined Cycle | NG | 257.6 | OP |
| CTG1 | Natural Gas Fired Combined Cycle | NG | 173.4 | OP |
| CTG2 | Natural Gas Fired Combined Cycle | NG | 173.4 | OP |
| GT10 | Natural Gas Fired Combustion Turbine | NG | 86.2 | OP |
| GT11 | Natural Gas Fired Combustion Turbine | NG | 86.2 | OP |
| GT12 | Natural Gas Fired Combustion Turbine | NG | 86.2 | OP |
| GT9 | Natural Gas Fired Combustion Turbine | NG | 86.2 | OP |
| GT1 | Natural Gas Fired Combustion Turbine | NG | 84.5 | OP |
| GT2 | Natural Gas Fired Combustion Turbine | NG | 84.5 | OP |
| GT3 | Natural Gas Fired Combustion Turbine | NG | 84.5 | OP |
| GT4 | Natural Gas Fired Combustion Turbine | NG | 84.5 | OP |
| GT5 | Natural Gas Fired Combustion Turbine | NG | 84.5 | OP |
| GT6 | Natural Gas Fired Combustion Turbine | NG | 84.5 | OP |
| GT7 | Natural Gas Fired Combustion Turbine | NG | 84.5 | OP |
| GT8 | Natural Gas Fired Combustion Turbine | NG | 84.5 | OP |
Continue exploring
Similar-capacity plants in the same state
Identity, technology and limitations
Use this record
Questions this evidence can answer
Use the name, place, date and identifiers above to confirm that you have the right Lagoon Creek power plant: capacity and generation | PowerPlantFacts record.
Read the reported values with their units, coverage dates and source notes. Keep observed facts separate from estimates or interpretation.
Follow the primary-source links and check the limitations before using this evidence for a decision, comparison or citation.
A closer look at Lagoon Creek
Variation in the published months
Across 12 numeric monthly generation entries, 1 has the highest recorded value (395,502 MWh) and 11 the lowest (32,009 MWh). Their difference is 363,493 MWh. Missing months have not been treated as zero.
Reading the MW column
In the 15 numeric rows displayed in this table, MW ranges from 84.5 (GT1, GT2, GT3) to 257.6 (STG1). The difference is 173.1 in the column's stated units. This summary covers the displayed rows and retains the table's period and scope.
Generator capacity in different operating conditions
| Generator ID | Technology | Nameplate MW | Summer MW | Winter MW | Minimum load MW |
|---|---|---|---|---|---|
| CTG1 | Natural Gas Fired Combined Cycle | 173.4 | 160.0 | 190.0 | 78.2 |
| CTG2 | Natural Gas Fired Combined Cycle | 173.4 | 160.0 | 190.0 | 78.2 |
| GT1 | Natural Gas Fired Combustion Turbine | 84.5 | 73.9 | 94.3 | 60.0 |
| GT10 | Natural Gas Fired Combustion Turbine | 86.2 | 72.7 | 92.8 | 60.0 |
| GT11 | Natural Gas Fired Combustion Turbine | 86.2 | 72.7 | 92.8 | 60.0 |
| GT12 | Natural Gas Fired Combustion Turbine | 86.2 | 72.7 | 92.8 | 60.0 |
| GT2 | Natural Gas Fired Combustion Turbine | 84.5 | 73.9 | 94.3 | 60.0 |
| GT3 | Natural Gas Fired Combustion Turbine | 84.5 | 73.9 | 94.3 | 60.0 |
| GT4 | Natural Gas Fired Combustion Turbine | 84.5 | 73.9 | 94.3 | 60.0 |
| GT5 | Natural Gas Fired Combustion Turbine | 84.5 | 73.9 | 94.3 | 60.0 |
| GT6 | Natural Gas Fired Combustion Turbine | 84.5 | 73.9 | 94.3 | 60.0 |
| GT7 | Natural Gas Fired Combustion Turbine | 84.5 | 73.9 | 94.3 | 60.0 |
| GT8 | Natural Gas Fired Combustion Turbine | 84.5 | 73.9 | 94.3 | 60.0 |
| GT9 | Natural Gas Fired Combustion Turbine | 86.2 | 72.7 | 92.8 | 60.0 |
| STG1 | Natural Gas Fired Combined Cycle | 257.6 | 205.0 | 235.0 | 96.8 |
EIA-860 2024 final source. Ratings describe capacity, not actual generation or availability. Missing ratings are not zero.
Source: US Energy Information Administration Form EIA-860 2024 plant and operable-generator workbooks; archive 2024. US EIA-authored information is generally public domain; cite EIA, preserve third-party exceptions, changes and no-endorsement context. Source-specific derived data.